|
|
|
Olá
Work: Replacement of a part of the CIP unit, from the client.
Technical description: Manufacture and installation of two isothermal vertical deposits, with 11 m3 and 12 m3 capacity. Installation of all interconnection tabulating the production unit.
|
|
|
|
|