Food Industry

Olá

Work:
Replacement of a part of the CIP unit, from the client.

Technical description:
Manufacture and installation of two isothermal vertical deposits, with 11 m3 and 12 m3 capacity.
Installation of all interconnection tabulating the production unit.
Follow us on Facebook! Follow us on Linkedin! Follow us on Youtube!
Rua Dr. Pinho Rocha
Zona Industrial de Pinhão - Pindelo
3720-454 Oliveira de Azeméis

Skype: fazendaesilva
geral@fazendaesilva.pt
Fazenda e Silva Lda.